Remodels & Renovations | 973.464.4169

bath designs bath essentialsscope of labor

What you get with a bathroom
renovation by simplified kitchen & bath

demolition
Gut bathroom to studs
Remove and haul away all debris

rough plumbing
Install shower and bath diverter
Install shower pan or tub
Prep for vanity
Prep for toilet

rough electric (to existing lines)
Install GFCI outlet
Install new switches
Rough fan/light/bluetooth combo

insulation
Install R-13 in exterior walls
Install fire blocking, as needed

sheetrock & wall prep
Install 1/2” moisture resistant sheetrock
Tape and spackle to paint-ready

tile
Install cement board in wet areas
Tile per design
Grout

final plumbing
Install shower/tub hardware
Install shower head
Install tub spout
Install vanity, vanity top, and faucet
Install toilet

final electric
Mount fan/light/Bluetooth combo
Install LED mirror
Install outlet/switch covers

install shower/tub doors

moldings
Install base moldings around door Install casings around door and window

paint (Sherwin Williams)
Apply paint to walls, ceiling and all trim (two coats)

accessory installation
Install towel bar, toilet paper holder, towel ring, and robe hook

Work detailed above is based on a full renovation bathroom.

If your bath update only requires a refreshed look, work performed varies.

Please contact us for a free in-home consultation so we can evaluate your needs and update your bath the simplified kitchen & bath way.